03

—

Our expertice

Activation

Feasibility, estimating and scheduling before you commit.

Service overview

Delivery model

Fixed fee

Typical size

Any

Team

Estimator, scheduler, PM

Timeline

4 – 16 weeks

Have drawings ready?

Send them over and get a fixed, line-item estimate within ten business days.

Feasibility, estimating and scheduling before you commit. We stress-test the budget and the program while changes are still cheap.

Feasibility & site studies

Line-item estimating

Value engineering & scheduling

Most of a project’s cost is decided before the first shovel. Pre-construction is where we turn an idea into a fixed scope, a line-item estimate and a schedule you can sign.

How it works

We start with the site, the brief and your budget. Our estimators, schedulers and engineers test the design against all three, then show you where the money and the time really go.

You can stop at the end of pre-construction with a complete estimate and schedule, or carry straight on into construction with the same team. Either way, the numbers are yours.

What you can expect

  • A site and feasibility review in the first two weeks

  • A line-item estimate within ten business days of drawings

  • A resource-loaded schedule with every long-lead item flagged

  • Value engineering options priced side by side

The cheapest place to solve a problem is on paper. Every risk we price out in pre-construction is one that never reaches the site.

Tower cranes over a large building site

Crane and logistics planning, fixed in pre-construction before the first lift.

Numbers you can build on

Our estimates are built from live subcontractor pricing, not rates from a book. That is why the price we agree at the end of pre-construction is the price we build to.

Ready when you are

When you are ready to build, the estimate becomes the contract and the schedule becomes the programme on site, with no handover between teams.

What's included

Everything on site,

under one contract.

01

Site management

A full-time superintendent and site team running logistics, access, daily coordination and close-out.

02

Trade procurement

Competitive bids from vetted subcontractors, levelled line by line and awarded on value, not just price.

03

Quality control

Inspection and test plans for every trade, mock-ups for critical details and documented sign-offs.

04

Logistics & deliveries

Crane, hoist and laydown planning with just-in-time deliveries to keep tight urban sites moving.

05

Weekly reporting

One report every Friday covering cost, schedule, quality and safety, with risks flagged early.

06

Single point of contact

One project director accountable for the whole contract, reachable directly from day one to handover.

Request an estimate

Have a project?

Let's build it.

Tell us about your site, timeline and budget. You'll get a clear, fixed estimate within 10 business days — no obligation.

We reply within one business day.

Built for the future.

Reactivating cement.

Cement Recycle

Buld the future green.
Build with Cement Recycle

Office

HQ Sveavägen 82, 113 59 Stockholm

LAB Kärrviolgatan 9A, 976 36 Luleå

info@cementrecycle.com

Built for the future.

Reactivating cement.

Cement Recycle

Buld the future green.
Build with Cement Recycle

Office

HQ Sveavägen 82, 113 59 Stockholm

LAB Kärrviolgatan 9A, 976 36 Luleå

info@cementrecycle.com

Built for the future.

Reactivating cement.

Cement Recycle

Buld the future green.
Build with Cement Recycle

Office

HQ Sveavägen 82, 113 59 Stockholm

LAB Kärrviolgatan 9A, 976 36 Luleå

info@cementrecycle.com

Create a free website with Framer, the website builder loved by startups, designers and agencies.